Project: Cross River Rail, Boggo Road Site Office Gantry 

Project: Cross River Rail, Boggo Road Site Office Gantry 

Date: 2020 Client: CBGU D&C JV Scope: BLASK Engineering collaborated with Ignite Engineering for the design aspect of this project. Once approved by our client we had to supply and install the 3-level temporary office structure.  Total Duration: 7 Weeks...
Leslie Harrison Dam, Bulk Head Door

Leslie Harrison Dam, Bulk Head Door

 Date: 2019 Client: Fulton Hogan Scope: Fabrication and supply of Bulkhead door. 20mm mild steel door and door frame with 50mm stainless steel hinges and latches welded. The door was fabricated and welded in our fabrication yard, sent away to have the hinges drilled...
Arraw Dam, Access Walkway Project, Weipa

Arraw Dam, Access Walkway Project, Weipa

Date: 2018 Client: Fulton Hogan Scope: Fabrication and Installation of the intake tower, platforms, and handrail for the Arraw Dam Project. Including full trial assembly, UT and mag particle testing. All fabrication and trial fit completed at our fabrication yard in...
Grower Sheds, Lunduvra

Grower Sheds, Lunduvra

 Date: 2017 Project: Grower Sheds, Lunduvra Client: Cameron Pastoral Company Scope: Supply and install of structures including: Shop drawingsGalvanisingSuspended ceiling Trimdek insulated roof panelInsulated suspended ceilingInsulated mid walls and corridor...