Date: 2020
Client: CBGU D&C JV
Scope: BLASK Engineering collaborated with Ignite Engineering for the design aspect of this project. Once approved by our client we had to supply and install the 3-level temporary office structure.
Total Duration: 7 Weeks
Approximate Value: $550,000.00