Date: 2020 Client: CBGU D&C JV Scope: BLASK Engineering collaborated with Ignite Engineering for the design aspect of this project. Once approved by our client we had to supply and install the 3-level temporary office structure. Total Duration: 7 Weeks...
Date: 2019 Client: Fulton Hogan Scope: Fabrication and supply of Bulkhead door. 20mm mild steel door and door frame with 50mm stainless steel hinges and latches welded. The door was fabricated and welded in our fabrication yard, sent away to have the hinges drilled...
Date: 2017 Project: Grower Sheds, Lunduvra Client: Cameron Pastoral Company Scope: Supply and install of structures including: Shop drawingsGalvanisingSuspended ceiling Trimdek insulated roof panelInsulated suspended ceilingInsulated mid walls and corridor...